<wbr id="fhjir"></wbr>

<nav id="fhjir"><listing id="fhjir"></listing></nav>

  1. <em id="fhjir"><span id="fhjir"></span></em>
    <form id="fhjir"><source id="fhjir"><option id="fhjir"></option></source></form>
      <wbr id="fhjir"><legend id="fhjir"></legend></wbr>
      <form id="fhjir"></form>
      <sub id="fhjir"><address id="fhjir"><nobr id="fhjir"></nobr></address></sub>

      <nav id="fhjir"></nav>

        <strike id="fhjir"><legend id="fhjir"></legend></strike>
        <nobr id="fhjir"><th id="fhjir"><sub id="fhjir"></sub></th></nobr>
        <form id="fhjir"></form>
        +961 1 498933 info@www.9x1jq1l.buzz
        • DSCF0119

        About the Project

        ?

        Supply and installation of Climate Control system serving the operating theaters including Laminar Flow Diffusers, 100% redundancy Chilled water system with BMS

        DATE :?2010
        STATUS :?CLOSED

        ?

        DSCF0119

        ?

        Project Info

        Client : New Mazloum Hospital - Tripoli
        Categories :
        二四六天天好彩福彩